| 01 | Legal manufacturer identity | Business license and the legal entity named on quotations, contracts, invoices, and product documents. | Confirm the contracting party is the actual manufacturer or clearly disclose any trading company or subcontractor. | Supplier 01–10: Not independently verified |
| 02 | Manufacturing capability | Facility address, production-flow overview, equipment list, and recent production records for the quoted sprayer type. | Check that the facility and production processes match the product being offered; distinguish in-house work from outsourced processes. | Supplier 01–10: Evidence required |
| 03 | ISO 9001 quality management system | Complete certificate showing certificate holder, site address, scope, standard edition, certification body, and validity dates. | Verify the certificate with the issuing certification body. ISO 9001 is a quality-management-system standard, not product approval. | Supplier 01–10: Certificate not supplied |
| 04 | Quality-control records | Incoming-material checks, in-process inspection records, final inspection criteria, and sample inspection reports. | Confirm acceptance criteria are measurable and cover the agreed model, configuration, and order requirements. | Supplier 01–10: Records to review |
| 05 | Product specification and performance | Datasheet and approved sample identifying sprayer type, materials, operating method, capacity, and stated performance parameters. | Compare the production sample and test results with the contract specification; do not rely on unverified catalogue claims. | Supplier 01–10: Model-specific data required |
| 06 | Electrical and battery safety, if applicable | Applicable-market test reports and declarations for the exact electrical or battery configuration; battery transport documents where relevant. | Requirements depend on product design and destination market. Match reports to the exact model, components, and declared ratings. | Supplier 01–10: Applicability and evidence to confirm |
| 07 | Market-specific product compliance | Applicable declarations, technical documentation, test reports, and product labels for each target country or region. | Determine obligations from product type and destination. A CE mark or declaration alone does not establish compliance with every market requirement. | Supplier 01–10: Destination-market review required |
| 08 | Materials and chemical restrictions | Material declarations or relevant laboratory reports for components and substances covered by the buyer’s market requirements. | Confirm the evidence covers the actual materials and product configuration. Requirements such as RoHS or REACH apply according to scope and market. | Supplier 01–10: Product-specific evidence required |
| 09 | Traceability and change control | Lot or batch identification method, component traceability records, and written process for notifying buyers of material or design changes. | Agree how changes affecting fit, function, quality, or compliance are assessed and approved before shipment. | Supplier 01–10: Process to verify |
| 10 | Pre-shipment inspection and corrective action | Pre-shipment inspection plan, agreed sampling criteria, defect classification, and corrective-action records where applicable. | Set inspection scope and acceptance criteria in the purchase agreement; retain approved samples and inspection records. | Supplier 01–10: Buyer-defined acceptance needed |