| Drawing and specification control | Ability to work to the current approved drawing, including tooth geometry, dimensions, tolerances, and revision status. | A controlled drawing review, revision record, and written confirmation of the applicable specifications. | Ask the supplier to identify critical-to-function dimensions and explain how changes are approved and recorded. |
| Material traceability | Whether the gear material matches the specified grade and can be traced from incoming stock to the finished part. | Material test certificates, heat or batch identification, and records linking the material batch to production lots. | Check that certificates identify the material and batch and can be matched to the parts being supplied. |
| Heat-treatment control | Control of the specified heat-treatment process and resulting properties, such as hardness and case depth when required by the drawing. | Process records and inspection results measured against the part specification, including the measurement method and sampling plan. | Confirm that test locations and acceptance limits follow the drawing or agreed inspection plan; do not rely on a generic hardness claim. |
| Tooth accuracy and inspection | Inspection of relevant gear characteristics, such as profile, lead, pitch, runout, and backlash where specified. | Inspection reports with actual results, specified tolerances, equipment identification, and calibration status. ISO 1328-1 may be relevant to cylindrical gear accuracy when applicable to the design. | Verify that the report covers the gear type and characteristics required by the drawing, rather than presenting an unrelated accuracy certificate. |
| Manufacturing process capability | Whether the supplier has suitable processes for the specified gear, including machining, gear cutting, finishing, and any required heat treatment. | A process flow, equipment list relevant to the part, and examples of in-process and final inspection records. | Ask how the supplier controls key process steps and handles nonconforming parts before shipment. |
| Application understanding | Understanding of the gear’s position in the assembly, operating loads, duty cycle, lubrication, and environmental conditions. | A technical review that identifies missing inputs and confirms assumptions before production begins. | Check that the supplier asks about operating conditions instead of selecting a replacement solely by external dimensions. |
| Prototype and first-article approval | A defined process for validating a new or revised part before routine production. | First-article inspection results, sample approval records, and agreed criteria for functional testing where applicable. | Agree in writing which measurements and assembly or operating checks are required before approving volume orders. |
| Quality management and corrective action | A documented system for inspection, lot identification, nonconformance handling, and corrective action. | Relevant quality-system certification where available, sample control records, and an example of a corrective-action report with sensitive details removed. | Evaluate whether corrective actions identify causes and prevention measures, not only replacement of the affected parts. |
| Delivery and supply continuity | Quoted lead time, production capacity for the requested order pattern, packaging, and communication of schedule changes. | A written production and delivery schedule, packaging specification, and shipment documentation plan. | Compare committed dates and order assumptions, including tooling, sample approval, and repeat-order lead times. |
| Commercial terms and after-sales support | Clarity of pricing, minimum order quantities, payment terms, warranty scope, and technical support responsibilities. | A written quotation and warranty terms that define coverage, exclusions, claim evidence, and response process. | Compare total purchasing requirements and claim procedures, not only the unit price. |